Ras Al-Khair Power & Desalination Plant, Phase-I Package "P" Power Plant

details

  • 2013-2018
  • Ras Al Khair, Saudi Arabia
  • SWCC-Saline Water Conversion Corporation
  • SEPCOIII Electric Power Construction Corporation.
  • SAR 136 Million
$data['project']->title
$data['project']->title
$data['project']->title

Project Overview

Complete Foundation  Works of Pipe Rack Structure, Steam Bypass Station, Duct bank and Cable Pit, Neutralization Tank, Demineralization Building, Air Compressor Building, Fire Water Pump House, Fire Water Retaining Basin, Waste Water Treatment Plant, Local Switchgear Building, Fuel Oil Bulk Transfer Pump Station, Back Up Fuel Oil Station, Foam Pump Station, Structure for Damp Condenser, Dump Condenser Drain Pit, Structure for Boiler Blow down Cooling Unit, Structure for Rotor Air Cooler, GRP Civil Works, Firefighting Civil Works, Gas Station Shed 1 & 2 Structure, Gas Storage Structure, Fuel Meter Structure, Pipe rack & Pipe Sleeper Structure.